ONGC suffered Rs 8,000 crore loss for poor rig management: CAG
In a report tabled in parliament, the CAG said ONGC`s non-productive time or idling time of rigs ranged between 19 and 23 percent over 2010-14.
Dec 09, 2015, 23:28 PM IST
In a report tabled in parliament, the CAG said ONGC`s non-productive time or idling time of rigs ranged between 19 and 23 percent over 2010-14.
Dec 09, 2015, 23:28 PM IST