New 6-Lane tunnel at Khambatki Ghat on Pune-Satara NH4 expected to be completed by March 2023

The total capital cost for the 6.43 km long 6-Lane tunnel at Khambatki Ghat on Pune-Satara highways (NH-4) is approximately Rs 926 Crore and is expected to be completed by March 2023.

New 6-Lane tunnel at Khambatki Ghat on Pune-Satara NH4 expected to be completed by March 2023
Image: Twitter

The new 6-Lane tunnel at Khambatki Ghat on Pune-Satara highways (NH-4) is expected to be completed by March 2023, Union Minister for Road Transport and Highways Nitin Gadkari informed in a series of tweets. The Khambatki Ghat tunnel is a twin tunnel with 3 lanes each and is currently under construction, with work happening in full progress, said Gadkari. He said the existing 'S' curve in Satara-Pune direction shall be completed soon that would lead to drastic reduction in accident risks.

The total capital cost for the 6.43 km long project is approximately Rs 926 Crore and is expected to be completed by March 2023. Nitin Gadkari said "today, our country is witnessing unprecedented infrastructural transformation under the leadership of Prime Minister Shri Narendra Modi & unfolding 'Prosperity Through Connectivity'."

He further stated that "New India Demands World Class Infrastructure." The tunnel is going to enhance connectivity and most importantly, provide direct benefits to the commuters through their Value Over Time (VOT) and Value Over Cost (VOC) savings.

The Minister said average travel time at Pune-Satara and Satara - Pune stretch through Khambataki Ghat is 45 minutes and 10-15 minutes respectively. With the completion of this tunnel, average travel time shall be reduced to 5-10 minutes.

Live TV

#mute

Zee News App: Read latest news of India and world, bollywood news, business updates, cricket scores, etc. Download the Zee news app now to keep up with daily breaking news and live news event coverage.